Municipality
|
State
|
Year
|
Single-family
|
Multifamily
|
Commercial
|
City of Boulder |
CO |
2020 |
1 EV-ready space per dwelling unit |
5% EV-installed, 15% EV-ready, 40% EV-capable (25+ spaces) |
5% EV-installed, 10% EV-ready, 10% EV-capable |
Denver |
CO |
2020 |
1 EV-ready space per dwelling unit |
5% EV-installed, 15% EV-ready, 80% EV-capable |
5% EV-installed, 10% EV-ready, 10% EV-capable |
Summit County |
CO |
2020 |
1 EV-ready space per dwelling unit |
5% EV-installed, 10% EV-ready, 40% EV-capable (10+ spaces) |
5% EV-installed, 10% EV-ready, 40% EV-capable (25+ spaces) |
Honolulu |
HI |
2020 |
1 EV- capable space per dwelling unit |
25% EV-ready (8+ spaces) |
25% EV-ready (12+ spaces) |
Chicago |
IL |
2020 |
|
20% EV-ready (5+ spaces) |
20% EV-ready (30+ spaces) |
Flagstaff |
AZ |
2019 |
1 EV-ready space per dwelling unit |
3% EV-ready |
3% EV-ready |
Sedona |
AZ |
2019 |
1 EV-capable space per dwelling unit |
|
5% EV-capable |
Tucson |
AZ |
2019 |
1 EV-ready space per dwelling unit |
|
|
San Jose |
CA |
2019 |
1 EV-ready space per dwelling unit |
10% EV-installed, 20% EV-ready, 70% EV-capable |
10% EV-installed, 40% EV-capable |
Fort Collins |
CO |
2019 |
1 EV-capable cpace per dwelling unit |
10% EV-capable |
|
Golden |
CO |
2019 |
|
1 EV-installed space per 15 parking spaces, 15% EV-capable |
1 EV-installed space per 15 parking spaces, 15% EV-capable |
Lakewood |
CO |
2019 |
1 EV-capable space per dwelling unit |
2% EV-installed, 18% EV-capable (10+ spaces) |
2% EV-installed, 13% - 18% EV-capable (10+ spaces) |
Massachusetts |
MA |
2019 |
|
|
1 EV-ready space (15+ spaces) |
Salt Lake City |
UT |
2019 |
|
1 EV-installed space for every 25 parking spaces |
|
Seattle |
WA |
2019 |
1 EV-ready space per dwelling unit |
100% EV-ready up to 6 spaces, 20% for parking lots with 7+ spaces |
10% EV-ready |
Oakland |
CA |
2018 |
|
10% EV-ready, 90% "raceway-installed", 20% total panel capacity |
10% EV-ready, 10% "raceway-installed", 20% total panel capacity |
Lakewood |
CO |
2018 |
1 EV-capable space per dwelling unit |
2% EV-installed and 18% EV-capable (13% EV-capable for tier uses) |
2% EV-installed and 18% EV-capable (13% EV-capable for tier uses) |
Palo Alto |
CA |
2017 |
1 EV-capable space per dwelling unit |
"1 EV-ready space per unit, 20% EV-capable for guest parking with 5% EV-installed" |
20% EV-capable, 5% EV-installed |
San Francisco |
CA |
2017 |
1 EV-ready space per dwelling unit |
10% EV-ready, panel capacity for 20%, raceway for 100% |
10% EV-ready, panel capacity for 20%, raceway for 100% |
Aspen |
CO |
2017 |
1 EV-capable space per dwelling unit |
3% EV-capable (240V individual circuit branch with EV-CAPABLE labeling) |
|
Atlanta |
GA |
2017 |
1 EV-capable space per dwelling unit |
20% EV-capable |
20% EV-capable |
Oregon |
OR |
2017 |
|
5% EV-ready |
5% EV-ready |
Boulder County |
CO |
2015 |
1 EV-ready space per dwelling unit |
2% EV-ready (for new construction and 50% or 5,000 SF additions) |
2% EV-ready (for new construction and 50% or 5,000 SF additions) |
Washington |
WA |
2015 |
|
For Group B, Group R-1 hotel and motel only, Group R-2 occupancies: 5% of parking spaces shall be EV-capable; size electrical room to serve 20% of spaces |
For Group B, Group R-1 hotel and motel only, Group R-2 occupancies: 5% of parking spaces shall be EV-capable; size electrical room to serve 20% of spaces |
New York City |
NY |
2013 |
|
20% EV-capable |
|
California (CalGreen) |
CA |
2010 |
1 EV-capable space per dwelling unit |
10% EV-capable |
10% EV-capable |